PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed Duct work hangers throughout the 1st floor Facing North (800x600).jpg Installed electrical conduit at Stair -4 (4th Floor) Facing East (600x800).jpg Installed electrical conduit at the steel column Facing West (800x600).jpg Installed shear studs at the lower roof Facing East (800x600).jpg Installed shear studs at the lower roof Facing South-West (800x600).jpg Welding miscllaneous steel plates at the lower roof Facing East (800x600).jpg Welding the tube steel at the Servery Room Facing North-East (800x600).jpg
Previous pageNext page Installed shear studs at the lower roof Facing South-West (800x600)
Installed shear studs at the lower roof Facing South-West (800x600)